UAV Batteries


Aobo Heavy-Lift UAV Battery Solution

Powering 1.5T Payloads in Extreme Conditions



"1.5T Payload Achievement: Redefining Heavy-Lift Drone Capabilities"

Key Metrics:
✔ 1.5 Ton payload capacity achieved
✔ 20+ Minute flight time (exceeding requirements)
✔ -30°C to 60°C operational range
✔ IP68 environmental protection

Background Visual:
Drone lifting power transformers in mountainous terrain with Aobo battery close-up


Customer Challenge

Requirements:

Payload: 1.5T equipment transport

Flight Time: Minimum 20 minutes

Environment:
• High-altitude cold (-25°C)
• Desert heat (55°C+)
• Coastal humidity & salt spray
• Construction site dust storms

Industry Pain Points:
✖ Existing solutions couldn't maintain voltage under heavy loads
✖ Battery overheating during continuous operations
✖ Premature failure from environmental stress



Aobo's Engineering Solution

Technical Specifications

Parameter

Aobo Solution

Industry Standard

System Voltage

800V Architecture

600V

Energy Capacity

45kWh Modular System

30kWh

Peak Current

2000A (5C Discharge)

1200A

Weight Efficiency

400Wh/kg Energy Density

280Wh/kg

Thermal Management

Active Liquid Cooling Loop

Passive Cooling

Breakthrough Technologies

✔ Titanium-Encased Cells: 30% weight reduction with impact resistance
✔ Multi-BMS Architecture: Redundant control for mission-critical safety
✔ Self-Drying Connectors: Prevent moisture accumulation in humid conditions
✔ Dynamic Power Allocation: Intelligent load distribution

Engineering Insight:
"Our 800V architecture reduces current by 40%, enabling lighter cabling while maintaining 1.5T lift capacity."
— Aobo Chief Battery Engineer


Performance Validation

Title: "Exceeding Every Operational Target"

Verified Results:
✅ 1.53T max payload achieved (102% of target)
✅ 22 Minute flight time with full load
✅ Zero performance degradation after:
• 50+ desert heat cycles
• 30 Arctic cold starts
• 100hr dust exposure testing

Field Data Graph:
Interactive chart showing voltage stability during 1.5T lift


Environmental Testing

 "Engineered for the World's Toughest Conditions"

Testing Gallery:

-30°C Cold Start: Instant power delivery

55°C Heat Soak: Maintained <45°C cell temp

IP68 Validation: 1m water immersion for 30 mins

Dust Chamber: 8hr continuous exposure test

Certifications:
• UN38.3      • DO-160G      • MIL-STD-810H


Operational Benefits:

Eliminated 70% of helicopter lifts ($500k/month savings)

Reduced crew deployment time from 6 hours to 22 minutes

Enabled night operations in -20°C condit


"Blueprint to Benchmark - Every Phase Engineered with Unwavering Focus"
—— Aobo New Energy